Skip to main content
This was retired on Aug 28, 2012

Miner

Miner was a compute cluster installed Miner at the Purdue Calumet campus on December 25, 2009 and operated by ITaP. It was the first major research cluster on the Calumet campus and represented a great step forward in Purdue Calumet's ongoing plan to foster more local, cutting-edge research. Miner consisted of 512 2-core Intel Xeon systems with either 4 or 6 GB RAM, 50 GB of disk, and 1 Gigabit Ethernet (1GigE) local to each node.

Lifetime Service

Details
Installed 2009-12-11
Retired 2012-08-28