Article #559: Scheduled Maintenance - RCAC home directory upgrades
Update - 7:00pm, 1/4/2013: - All community clusters (Steele, Coates, Rossmann, Hansen, Carter, and Peregrine1) are back in production. Radon is curr...
Update - 7:00pm, 1/4/2013: - All community clusters (Steele, Coates, Rossmann, Hansen, Carter, and Peregrine1) are back in production. Radon is curr...
As of 9:00am, are seeing a problem with the LustreC scratch filesystem that serves Carter, Hansen, and Peregrine1. To prevent any more jobs from runn...
Update: ITaP engineers have corrected the issue affecting the LustreC filesystem. The system is back in production. Job scheduling on Carter, Hansen a...
On April 24, 2013, network engineers will be relocating fiber optics that connect the Peregrine1 cluster to infrastructure in West Lafayette. This out...
Update: May 13, 2013 11:00pm: LustreC has been returned to service. Carter, Hansen, and Peregrine1 are back in production with queues enabled. Update...
The high performance scratch file system (LustreC) supporting the Carter, Hansen, Peregrine1, and WinHPC research clusters is in need of mandatory mai...
Nearly all major clusters operated by ITaP Research Computing are stopped due to issues with their storage systems relating to the power loss on the W...
All ITaP Research Computing systems are currently experiencing an issue with accessing network filesystems. A case has been opened with our vendor as...
UPDATE - As of 7:45pm Sunday, March 16th, 2014, the fileserver maintenance has completed successfully, and cluster systems are back online. All Resea...
In order to repair a hardware issue with the underlying disk storage comprising LustreC, ITaP storage engineers will execute a brief maintenance on th...
The Peregrine1 cluster will be unavailable beginning at 8:00am on Monday, May 19, 2014, for scheduled maintenance. The cluster will return to full pro...
Power has been restored and the Peregrine 1 cluster has been restarted and is in full production mode The Calumet campus is experiencing a power issue...
Engineering Computing Network (ECN) in coordination with Physical Facilities will be conducting a planned power outage in the MSEE building from 8am u...
On the morning of Thursday, February 5, 2015, Carter, Conte, Hansen, Peregrine1, Radon, and Rossmann login servers will be rebooted to apply an impor...
As of 3:15 pm the maintenance is complete and Research Data Depot is returned to full production. Original message: The storage servers powering the R...
UPDATE As of 4:45 pm Tuesday, May 19, all the work noted below has been completed and both Hansen and Peregrine-1 have been returned to full service....
Due to power work in the MSEE building, most ECN services will be unavailable between 6:30am – 9:00pm EDT on Saturday, August 15, 2015. For Research C...
The Peregrine1 cluster will be unavailable beginning at August 17, 2015 8:00am - August 19, 2015 6:00pm EDT, for scheduled maintenance. The cluster...
Update: September 22, 2015 1pm The work affecting Hansen and Peregrine1 scratch filesystems has been completed and the clusters are back in full produ...
As of 12:46, December 2, the home filesystem serving Conte, Hammer, Hansen, Hathi, Peregrine1, Radon, Rice, and Snyder was restored to normal operatio...