Scheduling of Jobs Paused on Brown
July 19, 2019 2:45pm – 4:30pm
Brown
Cooling was able to recover and scheduling was re-enabled on Brown at 4:30pm.
ORIGINAL: July 19, 2019 3:34pm
Starting at 2:45pm, new jobs are not being scheduled on the Brown cluster in order to lighten the load. The current hot weather outside is overtaxing Brown cooling systems. Existing jobs will continue to run as planned. As soon as the cooling systems are able to catch up, scheduling will be resumed.